Roland 43W is a dental lab equipment option for dental labs that want reliable performance and a smooth day-to-day workflow. Ideal for labs focused on accuracy, efficiency, and repeatable outcomes across cases.
Key benefits:
• Built for lab production environments
• Designed to support efficient workflows
• Backed by Nowak product guidance and support
Features
• Faster Milling Times with DGSHAPE CAM: New DGSHAPE CAM software included with purchase decreases milling times by up to 20% while increasing milling efficiency and predictability.
• No More Costly Filters: New filter-less technology eliminates the need for coolant tank filters reducing the cost of use by 20%.
• Reduced Maintenance: Routine mill maintenance is reduced with the new automatic coolant jet optimization feature with draining cycle compared to previous DWX-42W series models.
• Expanded Capabilities Built-In: New internal design includes compatibility with AK-1 Abutment Kit Material Adapters (AK-1-ME, AK-1-DE, AK-1-GE) for milling of Custom Titanium Abutments with pre-milled titanium blanks from MEDENTiKA® , DESS® , and . GeoMEDI
• New Tooling: New DGSHAPE ZTR-150D tooling streamlines the production of milling custom titanium abutments up to 20% faster than previous ZTB-150D designed exclusively for the DWX-43W.
• Added Value Accessories: The DWX-43W now includes a total of 15 high-quality DGSHAPE wet milling tools as well as the 6-pin material adapter (#ZV-42W) accessory for expanded milling capabilities and greater ROI.
• Open-Architecture Platform: DGSHAPE’s open architecture eco-system allows users to utilize their choice of scanner, CAD software, and restorative materials.
• Device Monitoring: DGSHAPE’s proprietary VPanel and DGSHAPE Cloud software are an added value of ownership that enables on-site and remote monitoring for all your current DWX devices.
Reduced Maintenance
Filter-Less Technology Reduces Operating Costs for Greater ROI
• No More Costly Filters: New filter-less technology eliminates the need for coolant tank filters reducing the cost of use by 20% exclusive to the new DWX-43W.
• Upgraded coolant tank tray design filters milling waste without the need for separate tank filters.
Reduced Maintenance
New Automatic Coolant Jet Optimization and Draining Cycle The new DWX-43W should remain powered on 24-hours a day to enable the new coolant optimization and draining cycle to automatically rinse the milling chamber with coolant every 12 hours and minimize user maintenance.
• Prevents contamination in the milling chamber by not allowing it to dry out, which promotes an overall cleaner eco-system. 12h
• Automatic cycle includes Spindle Run-in (Short), eliminating the need for daily maintenance.





